Cobblestone Farm Association
 
Michigan  
  Go to Related Society
 

The Ticknors
The Booths
The Campbells
Walking Tour
Time line
Errors and Terrors
Lincoln Logs
Cabin demolished
Moving the cabin
PLP
Can you name them
Stephen Mills
Stephen Mills story
Mary Campbell
Pitchforks
Marsh Hawks
RCC - 1929 Diary
Photos well documented
1869 Horace Booth letter
Historic or Historical
Log Cabin mystery
Best Rice Popovers
Cobblestones and Memories
HABS
HABS

Change Font Size:
Increase font size Decrease font size Restore default font size
 There was plenty of work to be done

There was plenty of work to be done

Handyman’s special” in a Realtor’s ad often means there’s lots of renovation work ahead. Did Cobblestoners know what they were getting into when the moved that old Willis log cabin to this site?

In July 1985, preservation architect Richard Macias, then a vice president of Hellmuth, Obata & Kassabaum, Inc., submitted a study of the log cabin with the above drawing and the following recommendations. There was lots of work ahead for the folks at Cobblestone Farm.

1. Rebuild doors (2) and frames to more appropriate rough-sawn plank and battens style. Replace hardware.

2. Replace window framing with 1 X 3 rough-sawn lumber, interior and exterior. All pegged fasteners––no nails.

3. Remove plywood and any inappropriate framing. Install window to match others and frame with rough-sawn 1 X 3 material.

4. Replace areas of existing logs to remove deterioration. Finish exposed areas to match.

5. Apply preservative––cure rot epoxy bond or equal to areas of soft wood. Seal wood.

6. Remove lettering.

7. Repair existing stairs.

8. Remove and replace gable ends on interior to more appropriate construction including framing and sheathing. All pegged fasteners, no nails.

9. Remove interior partition walls.

10. Install wooden floor over vapor barrier and sleepers. Rough-sawn oak, pegged.